Method
A definition, procedure, or rule the method requires.
Blend Technology presents
The Design Standard
For anyone commissioning a space: a standard that makes the lighting, sound, acoustics, air, and temperature work together for the people inside, and proves it before handover.
A design discipline for inhabited space
Every space is built for something. The method begins by stating that intention plainly before any product is chosen.
How to read this publication
A definition, procedure, or rule the method requires.
A published standard, metric, or study by someone else.
A numeric working target, not a scientific threshold.
A worked example, not a report from a client project.
This document defines UX for Spaces™, a design standard for how the technology layers of a space support what the people in it need, and the method that carries a project through it. The standard was authored by Jimmy Powers, Principal of Blend Technology, and Blend applies it on its own projects.
The method is called UX for Spaces™. Its working instrument is the UX for Spaces™ Framework, currently version 16.0, published as two workbooks, residential and commercial, with a Space Type Catalog shared by both. Its companion build standard, the Building Intelligence Standard, defines what the building's technology must be able to do to deliver what this standard specifies. This document explains the standard and its method so that architects, designers, builders, owners, and anyone researching it can understand it, apply its vocabulary, and cite it.
Four kinds of statement appear here, and they are labeled so the reader can tell them apart:
| Label | What it means |
|---|---|
| Method | A definition, procedure, or rule the method requires. |
| External reference | A published standard, metric, or study by someone else. Cited in the References section. |
| Practice target | A numeric value the method adopts as its working target. Where it is drawn from an external reference, the reference is named. A practice target is not a scientific threshold. |
| Illustrative | A worked example built to show the method. It is not a report from a specific client project unless stated. |
Every space is built for something. A primary suite is for rest and recovery. A study is for focus. A guest suite is for arrival and sleep. A dining room is for conversation. UX for Spaces™ begins by stating that intention plainly, before any product is chosen, and then designs every technology layer, and the building assemblies those layers depend on, to hold it. Two intentions show how the method runs.
A space for rest, recovery, and sleep. The intention is that a person lies down and the space holds dark, quiet, and a stable temperature until they choose to leave it. Every layer has a job:
A space for work and focus. The intention is that a person sits down and the space supports attention for as long as the work takes. Every layer has a job:
Both spaces follow the same chain: the stated need becomes a criterion with a unit, the criterion becomes coordinated behavior across every layer, each behavior is assigned to a trade and a drawing at a construction stage, the built result is measured against the criterion, and the record is adjusted in use. The rest of this document defines each link.
UX for Spaces™ exists because the layers that shape how a space feels are designed by different people who rarely design them together. Lighting, acoustics, HVAC, air quality, shading, and controls each pass their own specification. Nobody is responsible for how they behave in combination for the person in the space. The result is a space that meets every individual spec and still fails at what it was for.
The method fixes the responsibility gap. It defines what each space must do for the people in it, writes that as behavior the building can carry out, routes each behavior to the trade and construction stage that can deliver it, and then measures whether the built space does what was written.
It applies to residences, hospitality properties, workplaces, learning environments, retail and experience spaces, and performance spaces such as cinemas, studios, and listening spaces. The UX for Spaces™ Framework v16.0 covers all of these in seventeen behavioral categories, described below.
The method covers:
It does not cover equipment selection, brand comparisons, or pricing. Equipment is chosen to satisfy the behaviors, after the behaviors are written, and it is not the subject of this document.
A UX for Spaces™ designer can carry the method through construction, calibration, and ongoing care, as Blend does on its own projects, or hand a completed design to a qualified integration partner. The method is the same either way.
These terms are used exactly as defined here throughout UX for Spaces™ documents. All are method definitions unless noted.
| Term | Definition |
|---|---|
| Space | A named area of the project with a primary use and defined occupants. Every behavior in the project is bound to a space. A space, as the method uses the word, can be a whole room or a part of one, and is defined by what it is for and who is in it. Every space is assigned to one profile. |
| Space type | A catalog entry that defines what a kind of space is for: its intent, default performance targets, lead behavioral categories, acoustic class, color rendition, and light posture. The Space Type Catalog holds 148 types in 18 families, pre-mapped for residential, hotel, food and beverage, corporate, and wellness settings. A project can add a custom type where nothing in the catalog fits. |
| Profile | A project's numbered instance of a space type, carrying one set of answers, performance targets, and bound rows. Sleep and Rest 1 might be the primary suite and Sleep and Rest 2 the secondary bedrooms. A project holds as many profiles of a type as it needs, and every space assigned to a profile inherits what the profile carries. |
| Exception | An answer on a single space that differs from its profile, recorded on the space with the reason. |
| Intent | What a space is for, stated in terms of what it must do for the people in it. Intent is the spine of the project record. |
| Performance target | One of 31 terms the method uses to state intent, grouped in five families: Cognitive (Attention, Perception, Speech intelligibility, Decision making, Learning, Focus, Creativity), Physiological (Calm, Sleep, Restoration, Activation, Recovery), Social (Gathering, Conversation, Hosting, Privacy, Solitude), Atmospheric (Welcoming, Ceremonial, Celebratory, Playful, Contemplative, Protective, Performative), and Functional (Cooking and process, Wellness practice, Work and production, Storage and preservation, Display and exhibition, Circulation, Service and utility). A space carries one or more. Attention and Focus are separate: Attention is alertness and vigilance, moved mostly by light, air, and temperature; Focus is holding one task against interruption, protected mostly by acoustics, glare control, and quiet notifications. Restoration and Recovery are separate: Restoration is the mind coming back after demand; Recovery is the body coming back after exertion, illness, or stress. A performance target is always one of these words, never a number. Wherever this document pairs the word target with a number (practice target, build target, NC target, isolation target), it means a numeric criterion, and numeric criteria live in the behavior register, not the brief. |
| Spatial Performance Brief | The document that records each profile's space type, primary use, occupants, performance targets, and notes, and assigns every space in the project to a profile. Completed before any behavior is written. |
| Intention Declaration | The plain-language statement of each profile's intent, the spaces it covers, and its priority 1 and 2 commitments, produced from the Spatial Performance Brief. The owner approves it before Schematic Design drawings begin, and each trade signs its part at the commitment meeting. |
| User | Who a behavior applies to: resident, guest, staff, shared, or all. In hospitality and commercial work, staff is subdivided by role. |
| Moment | When a behavior applies: morning, midday, evening, night, sleep, gathering, work, transition, arrival, departure, or anytime. |
| Priority | A value from 1 (critical, must be enforced) to 5 (nice-to-have, implement only if cost-free). Drives conflict resolution and specification cuts. |
| Category | One of seventeen behavioral categories in the framework, such as Acoustic Design or Restoration. Categories describe what people do. |
| Behavior | A single row in the framework: when a stated condition is true, the building responds in a stated way. Written as a trigger and a response, bound to a space, user, moment, and priority. |
| Trigger | The condition that starts a behavior. A sensor reading, a time, a presence event, a scene activation, or a project condition such as "construction documents are in progress." |
| Experience | What will happen in a space, chosen from a fixed list: Reading; Sleeping; Watching movies or TV; Working out; Cooking; Hosting or entertaining; Meditating or relaxing; Focused work; Video calls; Napping; Gaming; Arriving and leaving; Listening to music; Recording music; Getting ready; Dining; Shopping; Recovery. A space carries one or more. Its experiences define its scenes, and each brings in, by default, every layer that supports, protects, or enhances it. Every behavior is tagged with the experiences it serves. |
| Role | What a behavior does for an experience: protects it (guards it from what would break it), supports it (makes it work as intended), or enhances it (makes it better than it would be without technology). One behavior can play a different role for each experience it serves. |
| Scene | A named posture of a space, called by one word, that sets several layers at once. Every occupied space starts with Pathway, Dim, and Bright; its experiences add the rest, such as Sleep, Read, Movie, or Cook. A contextual scene replaces the standard scene it stands for (Cook replaces Bright in a kitchen). A space can have any number of scenes. |
| Trigger (of a scene) | A way a scene can be started: a keypad button, a schedule, a touchscreen, an app, voice, or a sensor or event. Every scene has at least one. |
| Keypad | A physical control at a named location in a space (entry, bedside, desk) holding at most four scene buttons. Keypads ganged at one location each serve a different category, such as lighting and shades. Beyond four scenes in any category, the location takes a touch interface. A space can have several. A keypad is estimated until it is defined on the plan with electrical. |
| Autonomous Response | What a space does on its own, without a scene being called, listed by name: Air quality, Temperature hold, Glare control, Humidity hold, UV protection. |
| Scope | Where a row applies: the project, a building, a floor, a group of spaces, a profile, or a single space. The narrowest scope wins. |
| Rule applied | A tension between two behaviors that an operating principle already settles, such as Sleep overrides circadian. Recorded once per principle with the spaces it covers, and not counted as a conflict. |
| Pillar | One of six qualities that describe what the building is: Responsiveness, Anticipation, Awareness, Control, Adaptability, Calmness. Each behavior is tagged with the pillar it most directly informs. Pillars describe what the building is; categories describe what people do. |
| Calmness | The pillar that lets the building act without demanding attention. It arbitrates between competing behaviors, holds back actions that would intrude, softens every transition, keeps its hardware silent and at the periphery, contains its failures, and surfaces only what someone needs to act on, to the person who needs it. Verified at commissioning: equipment and actuator noise against the NC target, fade and ramp durations, idle screens dark, alert count and recipient per test event, failure containment. |
| Intervention depth | How deep in the building a behavior reaches: programming only; trim or finish level; device or specification level; infrastructure level; architectural level; structural level; operational policy only. It tells each trade whether a row is theirs. |
| Impacts Build | The latest construction stage at which a row must be acted on. Eight stages from Schematic Design through Post-Occupancy, plus enforcement states. Defined under Decision timing. |
| Conflict profile | A yes/no flag on a behavior that could collide with another category in the same space. A flagged row has a matching entry in the conflict register. |
| Alignment tag | A cross-reference from a behavior to an external framework: CTI (the Calm Tech Institute's eight principles), WELL (WELL Building Standard v2 feature codes), LEED (LEED v5 credit codes), BIO (biological and circadian relevance), MOOD (atmosphere and emotional register). A tag routes evidence; it does not certify anything. |
| Melanopic EDI | External reference. Melanopic equivalent daylight illuminance, the metric defined in CIE S 026:2018 for light as the non-visual system receives it. Written in lux and abbreviated M-EDI. Photopic lux multiplied by a source's melanopic daylight efficacy ratio (M-DER) gives M-EDI. |
| NC | External reference. Noise Criteria, a family of curves used to rate steady background noise in a space. The method states background noise targets for spaces as NC values. |
| RT60 | External reference. Reverberation time, the seconds it takes sound to decay by 60 dB. |
| STC | External reference. Sound Transmission Class, a single-number rating of how much airborne sound a partition blocks. |
| STI | External reference. Speech Transmission Index, a 0 to 1 measure of speech intelligibility at a listening position. |
Every requirement in a UX for Spaces™ project travels the same six links. If a link is missing, the requirement is not yet designed.
Read left to right: a need becomes a measurable or checkable criterion, the criterion becomes a set of physical and programmed decisions, each decision is assigned to a trade and a drawing at a construction stage, the built result is checked against the criterion, and the record is adjusted in use.
| Link | Question it answers | Where it is recorded |
|---|---|---|
| Human requirement | What does this person need this space to do, at any given moment? | Spatial Performance Brief, discovery notes |
| Environmental or functional criterion | What condition, if it held, would satisfy the need? Stated as a target with a unit, or as a checkable function. | Spatial Performance Brief (targets), behavior register (row response) |
| Coordinated design and behavior | What does the building do, physically and in programming, across every layer involved? | Behavior register, conflict register |
| Trade and drawing responsibility | Who delivers each part, on which drawing, by which construction stage? | Intervention depth and Impacts Build on each row; Technology Construction Package |
| Verification | How is it checked, at what position, with what instrument, and what was recorded? | Commissioning record |
| Tuning | What changed after occupancy, why, and against which row? | Post-occupancy log |
The chain is also the test for whether a document is complete. A behavior with no criterion is a wish. A criterion with no trade assignment is a hope. A trade assignment with no verification is an assumption.
The brief comes first. Method: no behavior is written until every space it could touch is named in the brief and assigned to a profile, because every behavior must bind to a real space in the project.
Space types and profiles. Most projects have many spaces that need the same thing: eight hotel guestrooms, four secondary bedrooms, twelve meeting rooms. The method does not define each one from scratch. Method:
Four rules govern profiles:
How the brief is built. Discovery begins with people, not systems. The UX for Spaces™ process calls the first stage Listen and Map: who is in the space, how they move, where they slow down, where things become frustrating or uncomfortable. The output is a map of daily life, the moments that matter most, and an emotional target for each area. The brief converts that map into rows.
Every space begins complete. Each space starts with every technology layer that would support, protect, or enhance its intention, its scenes, and its conditions. Light is part of every one. From there, the design is shaped to the project and the people in it, and layers are pared back where the budget, the building, or the household asks for it. The default is generous so that nothing is left out by accident, and anything set aside is set aside on purpose. Circadian lighting is part of this default wherever people spend time; it follows from the space's intentions and is never asked as a technology question.
The conversation stays with the life of the space. We talk about what will happen in each space, how people want to feel there, and what gets in the way: the glare in the afternoon, the road outside, the doorbell during a nap. The layers follow from those answers.
Sound is more than music. A soft, steady sound that settles a space for sleep, a chime that arrives gently, a soundscape for winding down. Each one belongs to the experience it serves.
One answer reaches everything it touches. Deep sleep in a space shapes its evening light, its shades at dusk and dawn, the sound that settles it, how the doorbell reaches it, and how its walls and speaker boxes keep it quiet. Each of those is carried to the trade, the drawing, and the stage where it is built.
Questions are asked once. Method. Each discovery question is asked once for the project and speaks of spaces, not rooms: "Does bright light or glare bother anyone in any spaces?" Each answer opens a list of the project's profiles and single spaces, and is placed where it applies. Answers that hold for the whole project skip the list. Any single space can be opened and changed; the change applies to that space only, and the space shows that it differs from its profile.
What each profile holds.
| Field | What goes in it | Example (illustrative) |
|---|---|---|
| Profile | A short name and a number, usually the family or type name, used everywhere the profile is cited | Sleep and Rest 1 |
| Space type | The catalog type ID and name, or Custom | SLP-01 Primary Suite Bedroom |
| Primary use | What the space is for, in plain words | Sleep, dressing, early departures |
| Occupant | Who uses it, and any needs that change the targets: chronotype differences, children, sensory sensitivity, staff roles | Two adults, different schedules |
| Performance targets | One or more of the 31 vocabulary terms | Sleep, Restoration, Privacy |
| Experiences | What will happen in the space, from the experience list. The space type pre-selects the usual ones; the profile confirms or changes them | Sleeping, Reading, Watching movies or TV |
| Notes | The nuance the terms cannot carry | One partner leaves before 6 am several days a week |
What each space holds. The space name the project will use everywhere, on drawings and in programming (Primary suite); its floor; its profile; and any exceptions, each with its reason.
Experiences define the scenes. Method. Discovery asks one question of every occupied profile: what will happen in this room? Each experience chosen adds its scenes to the space, and the space type pre-selects the usual ones. A Media Room pre-selects Watching movies or TV, which adds Movie. A bedroom where someone reads adds Read and places it on the bedside keypad. Every occupied space starts with Pathway, Dim, and Bright before any experience is added. The experiences are also the headings of the experience brief, where each one lists what protects, supports, and enhances it.
From target words to criteria. A performance target is a word; a criterion is a condition with a unit or a checkable function. Method: each target on a profile is expanded into criteria in the behavior register, not in the brief. The brief stays readable by the client. The register carries the numbers.
The expansion draws on the method's practice targets. A few examples, each a practice target unless marked:
| Target word | Criteria it commonly expands into |
|---|---|
| Sleep | Background noise at or below the space's NC target, with NC-25 as the usual practice target; light at the eye under 1 lux M-EDI during sleep (adopted from Brown et al. 2022); thermal setpoint held within a 1 degree band with no audible fan speed change; blackout available; circadian logic suspended while the sleep scene is active; evening light at 10 lux M-EDI or less from wind-down start; shades closed at dusk and opened at dawn or at wake; a soft, steady sound, where used, at or below 35 dBA at the pillow; the doorbell shown as light and sounded gently only where someone is awake while Sleep is active |
| Attention | Daytime light at the eye at or above 250 lux M-EDI (adopted from Brown et al. 2022); CO2 held under 800 ppm as a ventilation proxy, on the same terms as Focus; thermal setpoint held steady with no drift toward warm during occupied hours |
| Focus | Speech from adjacent spaces below intelligibility at the work position; background noise below NC-30; glare-free task plane; CO2 held under 800 ppm with ventilation response and an ambient indicator at 1000 ppm, where CO2 is used as a ventilation proxy and not as a health threshold (ASHRAE's 2025 position on indoor CO2 is explicit that no universal limit is supported; the controlled evidence points to accumulated bioeffluents, not CO2 alone); consistent task illuminance regardless of daylight |
| Conversation | RT60 in the range suited to social use, with 0.5 to 0.8 seconds as the practice range; audio at conversation-supporting level; kitchen extraction at the lowest effective rate while guests are present |
| Speech intelligibility | STI at or above 0.60 at all seating positions in a training or meeting space |
| Storage and preservation | Temperature, humidity, and UV held within the envelope of the most sensitive asset in the space; alert on deviation |
Recovery is one target set, whatever the reason. When a space is tagged Recovery, the framework sets every environmental factor at the most demanding published criteria available for healthcare environments and measures the space against them: for sound, the WHO Guidelines for Community Noise values for hospital ward rooms (30 dB LAeq indoors at all hours, night-time events not above 40 dB LAmax, treatment and observation areas not above 35 dB LAeq), which are more demanding than the FGI Guidelines' patient-room range of NC 30 to 40 and therefore govern on level, while FGI Table 1.2-3 supplies the partition criteria (STC 45 between patient rooms on the same floor, 50 floor to floor, 50 to public space, 60 to a service area) and Table 1.2-4 the speech-privacy criterion for confidential rooms (STI 0.12 or less at the unintended listener), with the method's steady floor below NC-20 and the mechanical-transition limits of Acoustic Design row 10; for air, ASHRAE Standard 170-2021 Table 7-1 for a patient room (2 air changes per hour of outdoor air minimum, 4 total, MERV-14 minimum filtration), with HEPA active in the space and the WHO 2021 air quality guideline values for particulates; for thermal, the same table's patient-room design range of 70 to 75 F (21 to 24 C) and relative humidity at or below 60 percent, held within 1 degree of the occupant's chosen value, inside the ASHRAE Standard 55 comfort zone (PMV within plus or minus 0.5, about 10 percent predicted dissatisfied, humidity ratio at or below 0.012); for light, the Brown et al. 2022 melanopic recommendations, and ANSI/IES RP-29-25 Table A-1 for the patient zone of a general patient room: 200 lux general, 4 lux night-light, 30 lux night observation, 400 lux reading at the head of the bed, with night-lights from amber or red sources or below 2800 K and every target reached through at least three-level control. Where no published criterion exists for a factor, the method sets a practice target from the best available evidence and labels it as such. The same targets apply whether the occupant is recovering from surgery, illness, travel, training, or a demanding day. The values are checked against the current edition of each source at project start; editions change, and the framework records the edition each value came from. This is a statement about where the targets come from; it is not a claim that the space is clinical, and the medical judgment stays with the occupant's physician.
What the brief does not do. It does not choose products, and it does not promise outcomes. A space tagged Sleep is a space the building will hold in a sleep posture to defined conditions. Whether a particular person sleeps well depends on many things the building cannot control. The brief commits to conditions.
A behavior is one row. When a stated condition is true, the building responds as specified. That sentence is the whole grammar of the framework, and everything else on the row is routing.
The seventeen categories. The UX for Spaces™ Framework v16.0 organizes behaviors into seventeen categories, in this order: Interface and Control; Acoustic Design; Biological Rhythm; Cognition; Recovery and Wellness; Restoration; High Performance Spaces; Safety and Trust; Access and Presence; Gathering; Preservation; Arrival and Departure; Transitions; Building Health; Sustainability; Learning Environments; Retail and Experience. Each of the two v16.0 workbooks, residential and commercial, holds 298 populated behavior rows across those categories; the two differ in wording where the setting differs, not in structure. Not every row applies to every project; a project record is the subset that binds to its spaces.
The fields on every row.
| Field | Purpose |
|---|---|
| Question (if required) | A discovery question that must be answered before the row can be bound. Only rows with an undefined variable carry one. "Which spaces get circadian lighting?" is a question row; the rows that follow it are the behaviors it unlocks. |
| Scene | The named posture the row belongs to, and its phase: Entry, Sustained, or Exit. A scene is specified as a sequence, not a snapshot. |
| When / Trigger | The condition. |
| Then / Building behavior | The response, across every layer involved. |
| Client notes | What the client said that shaped the row. |
| Impacts Build | The latest construction stage where the row must be acted on, or an enforcement state. |
| Space, User, Moment, Priority | The binding columns. A row without all four is a note, not a specification. Space accepts a profile, which binds the row to every space assigned to it, or a single space, which binds it there and overrides the profile's row for that space. |
| CTI, WELL, BIO, MOOD, Pillar, LEED | Alignment tags. Routing data for evidence and coordination. |
| Intervention depth | How deep the row reaches into the building. |
| Conflict profile | Whether the row can collide with another category in the same space. |
| Experiences | The experiences the row serves and its role for each: Protects, Supports, or Enhances. Pre-tagged in the framework and confirmed per project. A row that serves whatever happens in the space, such as CO detection, is tagged Every experience. |
| Default scope | Whether the row starts at the whole project or at the profile. Building Health, Sustainability, and the network rows of Safety and Trust start at the project. |
| Applies to | Occupied (spaces people use) or All (every space, including closets and storage, which get a short set of rows), and for device rows, where the device reaches. |
How a row is written. Method, in order:
Three example rows from the framework, condensed. These are framework rows, not project results.
| Category | Trigger | Response (condensed) | Depth | Impacts Build |
|---|---|---|---|---|
| Restoration | An intermittent or intrusive sound is audible in the sleep space above the tuned masking floor | Masking holds a tuned broadband spectrum, calibrated at commissioning to cover the measured intrusions, at or below the sleep masking ceiling of 35 dBA at the pillow. A floor above target is a separate row: masking is not raised, the source is flagged | Device / specification | Rough-in |
| Cognition | CO2 in the focus space exceeds 800 ppm during an active focus scene | Ventilation increases silently; at 1000 ppm an ambient indicator activates; the event is logged | Programming (with sensor at rough-in) | Rough-in |
| Acoustic Design | HVAC is being designed for a space with an NC floor target | Duct sizing, lining, flex connections, VAV location, diffuser selection, and mechanical isolation are reviewed against the target before mechanical drawings are finalized. NC-20 requires different duct design than NC-35. The mechanical engineer needs the target before sizing, not after | Architectural / mechanical coordination | Schematic / DD |
The third row shows something the method insists on: many behaviors are not automation at all. They are design reviews with a deadline. The framework treats "a decision must be made before this drawing is issued" as a building behavior, because if the decision is missed the space cannot behave as intended no matter what is programmed later.
Operating principles that govern every row. Eight rules from the framework sit above all categories:
Scenes, keypads, and triggers. Method. A scene is something a space can do; a keypad is one way to start it. The two are designed separately.
Autonomous Response. What a space does on its own, without anyone calling a scene, is listed per space by name, only where the space's rows call for it: Air quality (ventilation responds to CO2 and VOCs), Temperature hold (quiet correction within the band), Glare control (shades respond to glare), Humidity hold, and UV protection. Each item traces to the rows that create it. These are not keypad scenes.
Layers and defaults. Method. Every layer that supports, protects, or enhances an experience, a scene, or a condition is applied by default, and light is part of every experience. Any layer can be pared back for the project, a group, or a single space, with the reason recorded; protecting layers such as life safety and CO and air quality sensing are removed only by the designer. A layer can serve several uses: sound can carry music, a soft, steady sound, a soundscape, and a gentle doorbell, each its own choice. When any answer adds a layer to a space, every use that was off only because the layer was missing is offered again. A quiet air system is a baseline for the whole project, chosen once; no experience brings it in. The estimate starts with the full default and comes down as layers are pared back.
Scope. Method. A row can apply to the whole project, a building, a floor, a group of spaces, a profile, or a single space. Where two levels set the same row, the narrowest wins: space, then group, then profile, then floor, then building, then project. A row applied widely can be excluded from one space, or given that space's own version, with the reason recorded. Groups cross profiles and floors, so the quiet rooms of a house can be given rows together.
Detector placement. Device rows reach the spaces where the device belongs. Every occupied space has CO detection and air quality sensing (Building Health 20); open areas that flow together, such as a kitchen, dining room, and family room, share one sensing zone. Minimum CO locations: every level, outside sleeping areas, inside every sleeping space, any room with a fuel-burning appliance, and rooms that share a wall with an attached garage. A kitchen is not assumed to have gas; a kitchen with a gas appliance is marked so. Leak detection: baths, kitchens, service rooms, laundry, wet bars, and the water heater location.
Specification gates. Some requirements are not behaviors. They are gates a product or system must pass before it is approved for use, and they carry no CTI tags. The framework holds two sets on its Standards sheet: the Lighting Specification Standard (color rendition, flicker, spectral data, glare, dimming) and the Network and Security Standard. The second exists because every behavior in the register, including the privacy and access behaviors, runs on the building systems network, and a promise of privacy is only as good as that network. Its ten gates:
| Gate | Requirement |
|---|---|
| Segmentation | Building systems run on dedicated network segments, separated from guest, tenant, business, and clinical networks. Cameras, access control, and building controls are separated from one another. Traffic between segments is denied by default and allowed only where a documented behavior requires it. |
| Unique credentials | No factory default passwords. Every device, service, and user account has a unique credential, stored in a managed password vault with role-based access. No shared logins. |
| Local-first | Every bound behavior runs on the local network without internet. Cloud services may add remote access, updates, and reporting; no behavior depends on them. |
| Remote access | Time-windowed, scoped, logged, and revocable, the same rule the framework applies to physical vendor access. No inbound ports open to the internet. Multi-factor authentication over an encrypted connection. |
| Updates | A documented update plan per system: who applies updates, how often, how they are tested, and the rollback path. Security updates are applied within a defined window, outside occupied hours. Equipment nearing the end of manufacturer support is flagged with a replacement plan. |
| Encryption | Data encrypted in transit and at rest wherever the platform supports it. A system that cannot encrypt is isolated and the limitation documented. The storage location of every data stream is recorded. |
| Logging | Administrative logins, remote sessions, and configuration changes are logged with user and timestamp, kept for the period the owner sets. |
| Supported products | Devices on building systems segments come from manufacturers that publish security updates and a support lifecycle. |
| Owner control | At close-out the owner receives all credentials, administrative rights, network documentation, the update plan, and the remote access record. The owner can change service providers without losing control of any system. |
| Security commissioning | Verified before handoff and entered in the commissioning record. |
Where the owner's IT policy or a compliance regime sets a stricter requirement, the stricter requirement governs. The choices that belong to the owner (who governs the network, which compliance regimes apply, what remote support is permitted, and which data must stay on premises) are question rows in Safety and Trust.
Sensing by privacy expectation. A design rule on the Standards sheet governs awareness of falls and medical distress. Each space uses the least identifying sensing method that can meet its requirement: presence sensors everywhere as the baseline; millimeter-wave radar, which detects presence, posture, and motion with no image, in bedrooms, bathrooms, and recovery spaces; thermal or infrared imaging for bed and chair exit; acoustic analytics, processed locally with no speech recorded, where there is no line of sight; and cameras only at exteriors, entries, circulation, and shared areas, never in bedrooms or bathrooms. The building acts first on a detection with responses that help if it is right and do no harm if it is wrong, such as raising lights along the route and alerting the designated people. Actions with consequences beyond the space, such as unlocking the entry for responders or calling emergency services, follow their confirmation or an unanswered check-in within a time the owner sets. Detection is processed locally, and the owner sets retention and visibility of the data. Which spaces need this, and which methods are acceptable, are decided in discovery (Safety and Trust, row 24).
Two categories will target the same space with different requirements. The method expects this and writes the resolution down before construction, so the rule makes it into specification rather than being improvised at commissioning.
The priority scale. Method:
| Priority | Meaning |
|---|---|
| 1 | Critical. Non-negotiable, must be enforced. |
| 2 | High. Clear default, override only with explicit reason. |
| 3 | Medium. Resolve case by case based on context. |
| 4 | Low. Flexible, prefer the simpler implementation. |
| 5 | Nice-to-have. Implement only if cost-free. |
Priority does two jobs. It decides which behavior wins when two collide, and it decides what gets cut when budget or ceiling depth runs out. A row at priority 5 is the first thing removed from a specification; a row at priority 1 is the reason a wall gets thicker.
Arbitration. Method. When behaviors meet in a space while it is running, a fixed order decides: life safety first, then protected behaviors, then a scene a person called, then automations, then defaults. A scene a person called interrupts automations only on the layers it touches. The designer sets how an interrupted automation returns: when the scene is released, after a set duration, at a time of day, at sunrise or sunset, when the space is vacant, or at the next cycle. Focus interrupts circadian for one hour, then circadian fades back. Two kinds of protection can be set: a behavior that no scene may interrupt (air quality targets), and a scene that excludes a space (All Off does not affect the office while Focus is running there).
Rules applied are not conflicts. Where an operating principle already settles a tension, such as Sleep overrides circadian or life safety overrides everything, the register records it once as a rule applied, with the spaces it covers. Only tensions no principle settles are conflicts. This keeps the conflict register to the decisions that still need a person.
The conflict register. Every row flagged with a conflict profile has an entry that names the space, the two categories and moments in tension, what each requires, the resolution rule, and the priority of the rule. The framework ships with illustrative patterns that a project adapts or replaces with the household's or operator's own logic. Four of them, condensed:
| Space | Requirement A | Requirement B | Illustrative resolution rule |
|---|---|---|---|
| Great room | Morning workout: bright cool light, high airflow, music up | A household member asleep in the adjacent primary suite | The workout scene runs at full only when the primary suite is unoccupied. Otherwise audio is isolated to the great room and acoustic output is dampened. Priority 1. |
| Kitchen open to the great room | Cooking: high extraction, bright task light | Dinner guests in the great room: quieter HVAC, ambient light | The hood runs at its lowest effective rate while guests are present. Task lighting dims to ambient when guests are visible. Priority 3. |
| Home office | Work hours: tight thermal band, low noise, masking | Evening gathering spillover: open, social, music throughout | The office isolates acoustically regardless of mode. Gathering audio does not extend into the office space. Priority 2. |
| Guest suite | A guest is present: pre-conditioned, restoration-grade defaults | Unoccupied: conservative setpoints, minimal operation | Mode switches on the guest arrival and departure triggers. Pre-conditioning begins four hours before expected arrival. Priority 3. |
What programming cannot fix. Method, stated plainly because it is the most common misunderstanding about this work: a resolution rule can decide which scene wins, but it cannot manufacture physical separation or mechanical capacity that was never built.
Masking ceilings. Practice targets, measured with the tuned spectrum at the occupant position. The build target is for the steady floor; the ceiling is the most masking the space will carry before the source is routed to correction. Anchors: WHO Guidelines for Community Noise (1999) bedroom values of 30 dBA continuous and 45 dBA maximum; Basner et al. 2014 on steady versus fluctuating noise during sleep; ANSI/ASA S12.2-2019 for NC. The FGI Guidelines cap electronic masking in healthcare spaces at a 48 dBA background; every ceiling below sits under it.
| Acoustic class | Build target (steady floor) | Masking ceiling | Above the ceiling |
|---|---|---|---|
| Sleep, recovery, nap | NC-25 | 35 dBA at the pillow | Isolation problem. Masking held; source flagged; client informed the space will not meet its rest target. |
| Focus, learning, private office | NC-30 | 40 dBA at the work position | Same escalation. |
| Hospitality guestroom | NC-30 | 38 dBA at the pillow | Same escalation, recorded per key. |
| Open social, dining, retail | NC-35 to NC-40 | 45 dBA | Masking rarely needed; the ambient audio program does the job. |
In the Space Type Catalog these four rows are the Sleep, Guestroom, Focus, and Open social classes. Every type carries one of them or one of four more: Recovery (a steady floor below NC-20 while the space is in use for recovery, under the recovery criteria above); Performance (below NC-20, with masking not used and room acoustics set by the High Performance Spaces rows); Not set (no steady-floor target for the space itself, whose noise is kept from reaching its neighbors); and Set at brief (the designer sets the target for the project and labels it a practice target).
A person asleep is woken by change more than by level, so a steady 35 dBA floor that buries a cycling compressor is a better sleep environment than a quieter one that fluctuates. That is the trade masking makes, and it is made only after the source and the transmission path have been addressed: the method's evidence review, Human Performance as a Building Design Requirement, notes a 2026 polysomnographic trial in which the tested pink noise itself altered sleep structure, which is reason to treat continuous masking as the last layer rather than the first. A 45 dBA floor in a bedroom is outside the WHO envelope and is not a trade the framework allows.
This is why the conflict register is written during design and why each entry carries an intervention depth. A conflict whose resolution is "structural" or "architectural" is a drawing change. A conflict whose resolution is "programming only" is a rule. The register says which, before anyone assumes the software will handle it.
A behavior row is a coordination instrument. Its intervention depth tells each discipline whether the row is theirs, and the response text tells them what the row needs from them. The UX for Spaces™ designer holds the space's intent and the register; each trade holds its own drawings and its own professional responsibility.
Who owns what. Method. The table maps intervention depth to the disciplines most often responsible. Real projects assign by contract; this is the default routing.
| Intervention depth | What it typically means | Discipline that carries it |
|---|---|---|
| Structural | Decoupled framing, floating floors, vibration isolation, mass-loaded assemblies | Structural engineer, architect, framer |
| Architectural | Ceiling depth, wall thickness, equipment closet size, glazing type, geometry, door schedule, orientation | Architect |
| Infrastructure | Pre-wire, conduit, structured cabling, wall boxes, ceiling rough-in, rack space, shade pockets | Electrical and low-voltage contractors, from the Technology Construction Package |
| Device / specification | A specific sensor, luminaire, driver, motor, controller, hood, or diffuser must be selected | Lighting designer, MEP engineer, the UX for Spaces™ designer, interiors, depending on the item |
| Trim / finish | Keypad placement, fixture termination, register grilles, valve trim, door hardware | Electrical, interiors, millwork |
| Programming | Scenes, logic, thresholds, transitions, holds | The UX for Spaces™ designer or the integration partner |
| Operational policy | Staff rules, retention policy, service windows, network governance, remote access policy, update windows | Owner or operator |
What each discipline gets from the register. Instead of a technology package that arrives after MEP is complete, each discipline receives its rows early:
The seat. The UX for Spaces™ designer's coordination role sits alongside the architect, lighting designer, MEP engineer, and interior designer during Schematic Design and Design Development, in its own seat. It does not replace any of them. The lighting designer still designs the lighting; the register gives the lighting designer the space intent, the gates, and the deadline.
Intention first, then commitment. Method. The method is collaborative, and it only works if the construction team has bought in before drawings begin. Buy-in is built in two steps.
The commitment meeting is the opening that matches the experiential sign-off at the close: the project begins with agreement on the intent and ends with verification against it.
Partner at every phase. Decisions come up in the field that no drawing anticipated: a relocated beam, a substituted fixture, a duct that has to move. The UX for Spaces™ designer stays available through every construction stage to answer them. Method:
Field questions are answered within one business day, so that asking is never slower than guessing.
Every active row carries an Impacts Build value: the latest construction stage at which the decision still has to land. Miss it and the behavior becomes a retrofit, or becomes impossible. Method: pick the stage where the work or decision must still be made, not the stage where it would be convenient.
The eight stages.
| Stage | Order | What lands here |
|---|---|---|
| Schematic / DD | 1 of 8 | Concepts shaped, plans not yet drawn for permit. Site acoustic survey, geometry review for performance spaces, STC and NC targets issued, rack location, orientation and daylight geometry, space intent. |
| Construction Docs | 2 of 8 | Permit-ready drawings finalize. Wall thicknesses, ceiling depths, equipment closets, glazing schedules, door schedules, rated penetrations. |
| Foundation / Framing | 3 of 8 | Structure goes up. Decoupled wall framing, vibration isolation, structural acoustic work, floating floors. |
| Rough-in | 4 of 8 | Low-voltage cabling, pre-wires, sensor placements, in-wall and in-ceiling boxes, motorized shade pockets. Last chance before drywall closes. |
| Insulation / Drywall | 5 of 8 | Mass-loaded vinyl, acoustic batts, sound-rated assemblies, acoustic sealants. Walls close after this. |
| MEP Trim / Finish | 6 of 8 | Keypads, fixtures, terminations, grilles, valve trim, door hardware. |
| Commissioning | 7 of 8 | Programming, scene tuning, network configuration, audio and lighting calibration, acoustic and light measurement. Systems verified before handoff. |
| Post-Occupancy | 8 of 8 | Refinements, software updates, additions to existing infrastructure. No deadline. |
Enforcement states. A row that is not simply assigned to a stage carries one of these instead, so that no row is silently dropped. A row that misses its stage on new work is never reclassified as an existing condition; it is recorded as a missed stage, so the miss stays visible and the owner decides with the cost in view:
| State | Meaning |
|---|---|
| Assigned | The construction stage is confirmed for this project. |
| Deferred | Acknowledged and intentionally delayed. The reason is noted. |
| Not Applicable | The behavior does not apply to this project scope. |
| Existing Condition Constraint | The condition existed before the project began, as in a retrofit or an existing structure, and the stage cannot be reached. The behavior must be achieved within remaining scope, or recorded as not achievable. This state does not apply to work built during the project. |
| Missed Stage | The row's stage passed during the project without the decision landing. Recorded as a deviation with the row, the stage it missed, and what recovery would take at its intervention depth. The owner decides whether to recover it or accept it as a documented limitation. A missed priority 1 or 2 row is always brought to the owner. |
| Post Occupancy Only | Tuning, refinement, or policy that can only be resolved after move-in. |
Programming is due before purchase. Method. A Programming only row carries Construction Docs as its Impacts Build. The programming is written and checked against the specified hardware and drivers before any equipment is purchased, so a hardware or driver problem is found before a bad purchase, not after installation. Tuning and verification of that programming still happen at Commissioning.
Why the stage matters more than the technology. Most of what makes a sleep space quiet, a focus space private, or a cinema accurate is decided at stages 1 through 3, before any technology is purchased. The UX for Spaces™ process stages Listen and Map, Define Experiences, and System Logic are aligned to run before and during Schematic Design for this reason. The seven process stages and the eight construction stages are different sequences: one describes the designer's work, the other describes the building's. A row's Impacts Build value is always a construction stage.
The project record is a set of documents that together carry the chain from need to tuning. For teams that work in commissioning terms, the Spatial Performance Brief plays the role of the Owner's Project Requirements and the behavior register plays the role of the Basis of Design: the first says what the building must do for the people in it, the second says how each discipline will produce that. Method: each document below is produced at the stage named, and later documents reference the rows in earlier ones by number rather than restating them.
| Document | Produced | Contents |
|---|---|---|
| Discovery summary | Listen and Map | Behaviors, routines, constraints, and the moments that matter, as observed and as told. |
| Spatial Performance Brief | Define Experiences | Every profile: space type, primary use, occupants, performance targets, notes. Every space: name, floor, profile, and exceptions. |
| Intention Declaration | End of Define Experiences | Each profile's intent, the spaces it covers, and its priority 1 and 2 commitments in plain language, generated from the brief. Carries the owner's approval. |
| Commitment record | Start of Schematic Design | Each trade's signature against the rows routed to it, with any row it could not commit to and where that row went in the conflict register. |
| Behavior register | Define Experiences through System Logic | The project's bound rows from the framework plus project-specific rows, with all fields filled. This is the specification of behavior. |
| Conflict register | System Logic | Every flagged conflict with its resolution rule, priority, and intervention depth. |
| Alignment documentation | System Logic | Per space: key moments, system behaviors, and the mapping to CTI principles, WELL features, and biological strategy; control and interaction model (primary interactions, automated behaviors, manual overrides, priority logic); trigger, condition, and response table; dependencies (sensors, time-of-day logic, occupancy conditions, external data); performance criteria (light levels and timing, acoustic targets, air thresholds, temperature and humidity ranges); exceptions and edge cases; coordination notes. |
| Technology Construction Package | Design and Document | Drawings, schedules, and diagrams for construction: system locations and infrastructure, device placement coordinated with architecture and MEP, power, heat, and environmental requirements, wiring, pathways, and equipment relationships, rack elevations, acoustic recommendations, and the network topology and segmentation plan. For general contractors, electrical and low-voltage trades, millwork and architectural teams, and integration partners. Deviations are reviewed before execution so the intended behavior is preserved. |
| Security handoff record | Build and Commission | Credentials and administrative rights transferred to the owner, network topology and segmentation plan, the update plan, the remote access policy the owner chose, and the storage location of every data stream. |
| Experience brief | System Logic | Per space, each experience with what protects it, supports it, and enhances it, listed from the space's active rows, plus what serves every experience in the space. Every line traces to a row. Written for the owner. |
| Keypad schedule | Design and Document, by Construction Docs | Every defined keypad: space, location, lighting loads, its category, and its buttons (four scenes per keypad; ganged keypads serve different categories). Issued to electrical. |
| Programming files | Design and Document, by Construction Docs | The scenes, triggers, keypad assignments, Autonomous Response, logic, thresholds, and transitions that implement the register, in the form the control platform executes. Written before equipment is purchased and checked against the specified hardware and drivers. |
| Commissioning record | Build and Commission | What was measured, where, with what instrument, and against which target; functional verification results per row. |
| Experiential sign-off | Build and Commission | A checklist of the deliverables above with owner, status, and stakeholder approval, ending in final client validation. |
| Field decision log | Schematic / DD through Commissioning | Every field question raised by a trade, the rows it touched, the decision, and who made it. |
| Post-occupancy log | Tune in Real Use onward | Every change after move-in, dated, with the row it changes and the reason. |
The experiential sign-off. The method closes a project against the experience, not against a device count. The sign-off template lists twelve items in eight groups: Discovery (discovery summary); Experience (experience definitions by space and moment, emotional intent targets by space, movement and flow mapping); System (experience-to-system mapping, system behavior and logic, scene and automation definitions); Interaction (user interaction model); Wellness (calm, WELL, and biological alignment); Performance (performance criteria for light, sound, air, and thermal); Validation (edge cases and exceptions); and Sign-Off (final stakeholder approval). Each carries an owner, a status, and a signature.
Row numbering. Every row in the register keeps its framework category and number (for example, Restoration 6) plus a project suffix when a project-specific row is added. Drawings, commissioning entries, and post-occupancy log entries cite that number. This is what lets a builder ask "which row requires this" and get an answer.
Commissioning is not about devices turning on. It is about the space behaving correctly. Every scene, automation, and response is tested against the intended experience, and every numeric target in the register is measured at a defined position and recorded. Method: a target that was never measured is aspirational, and the commissioning record says so.
Three kinds of check. The method distinguishes them because they answer different questions and use different instruments.
| Check | Question | How |
|---|---|---|
| Field capture | What are the actual conditions in the finished space? | Calibrated handheld instruments at defined positions: spectrometer or melanopic meter at the eye plane, sound level meter and analyzer at the listening or sleeping position, flicker meter at multiple dimming levels, illuminance grid across the task plane, CO2 and particulate reference instruments. |
| Installed-sensor validation | Do the building's own sensors agree with the reference instruments? | Each installed sensor is compared against the field capture at the same position and time. Offsets are recorded. A sensor that disagrees beyond its stated accuracy is relocated, recalibrated, or replaced, because every behavior triggered by that sensor depends on it. |
| Functional verification | Does each row do what it says? | Each bound row is exercised: the trigger is produced, the response is observed across every layer named, transitions are timed, overrides are tested, and the failure mode is checked (network loss, controller restart, power interruption). Pass, fail, or deviation is recorded per row. |
Per space, not per profile. Every space is measured at its own positions, because two rooms built to the same profile are still built separately. The record lists each space under its profile, and a profile passes only when each of its spaces does.
What is measured, by kind of space. From the framework's commissioning rows. These are practice requirements within the method.
Targets and current conditions are kept apart. The commissioning record has two columns for every criterion: the target, and the measured value. A target that came from intent alone, with no site survey or baseline behind it, is marked provisional until it has been measured once in the built space. A target is never rewritten to match a measurement. If the measurement misses, the record says so and the deviation is routed to the row's intervention depth: a programming fix, a device change, or, where the miss is architectural or mechanical, a documented limitation with the reason.
Mechanical transitions in sleep spaces are a separate requirement. A mechanical system can meet its steady-state noise target and still wake someone when it starts, stops, or changes capacity, because sleep is disturbed by the change above background more than by the level. The method's evidence review, Human Performance as a Building Design Requirement (see References), sets this out from the polysomnographic literature and defines the requirement the method applies. For every sleep space the criterion schedule carries three acoustic limits, not one: the steady background, the absolute event maximum, and the permitted rise above the preceding stable background, with the sampling interval, event window, and instrument time weighting stated so that unlike measurements are not subtracted. The acoustician and mechanical engineer enter the numbers before schematic sign-off; an unassigned number is an open design item, not permission to skip it. The acceptance test is run at each pillow position in the agreed sleep configuration (doors, windows, and shades as they will be), synchronized with equipment-state logs, exercising starts, stops, minimum-load operation, speed and stage changes, dampers, pumps, and defrost where applicable, with representative overnight logging to catch repeated or combined events a short demonstration misses. Raising masking, reducing required airflow, or disabling necessary operation does not close the requirement.
Every numeric criterion carries eight fields. Purpose (the activity and need it serves); location and receiver (the position, eye or ear height); operating condition (occupancy, doors, windows, shades, equipment, time mode); criterion (metric, units, target, tolerance, permitted excursion); basis (code, standard, research recommendation, or explicit project preference); test (instrument, method, duration, averaging); accountability (design owner, installer, verifier, and who corrects); operation (maintenance, fault response, retest, override). A number without these fields is not yet a requirement.
Three result categories stay separate. A delivered physical condition (airflow, light at the eye, sound spectrum) establishes whether the requirement was met under the tested conditions. An occupant's reported experience (comfort, distraction, reported sleep) is recorded with its context and never merged with the physical result. A clinical or physiological outcome (sleep stages, a diagnosis, a validated biomarker) is established only by a study designed to establish it, and a consumer wearable does not qualify. The commissioning record and the post-occupancy log keep the three in separate columns.
Two technical rules that come up at commissioning.
Once the space is occupied, refinement begins. Real life introduces nuance the register could not know: a wake time that moves, a guest who reads later than the wind-down assumed, a sensor whose field of view catches a hallway. The UX for Spaces™ process calls this stage Tune in Real Use.
How tuning is done. Method:
Drift. Buildings do not stay commissioned. LED output depreciates and phosphors shift spectrum. Sensors drift. Filters load and fan noise rises. Furniture, rugs, and curtains change absorption and reverberation. Scene logic drifts from intent after user modifications. Drift is cumulative across systems, and it is silent unless measured.
Monitoring. Method. Where the project has installed sensors, the conditions they measure are monitored continuously against each row's tolerance. Installed sensors are validated against reference instruments at commissioning. After that, the monitoring compares each sensor against independent peers and known reference conditions. Sensors do not drift at the same time or in the same direction, so a sensor that diverges from its peers is the anomaly, and it is found without waiting for a calendar date. That check holds when three conditions are met, and the design provides for them:
A field check with reference instruments is triggered when a sensor diverges, when a monitored condition moves outside its row's tolerance, or when a report from occupancy points to drift.
Recommissioning. Drift is silent unless something measures it. The method recommends repeating the commissioning measurements at the original positions and comparing them to baseline, on a schedule the owner chooses. Annual recommissioning is the default recommendation for spaces carrying priority 1 rows, such as sleep, recovery, and performance. Where monitoring is in place, recommissioning concentrates on what the sensors cannot measure and on what monitoring has flagged. The scope, when run in full, covers M-EDI, flicker, and uniformity in circadian spaces; NC and RT60 in acoustic spaces; HVAC static pressure where fan noise governs an NC target; calibration of lux, CO2, occupancy, and temperature sensors; shade motor speed, noise, and limit behavior; and scene verification against the register. Deviations are corrected and documented.
What tuning is not. It is not a way to reach a target that construction missed. If the sleep space's partition transmits the neighbor's television, tuning can change scenes and masking, and the log will record that the isolation target remains unmet and why.
The intent belongs to the owner. The register is the owner's record of what the building was designed to do for the people in it, and it is handed over at sign-off in a form the owner, a future operator, or a future technology designer can read without the original designer present.
Roles. Method:
| Role | Responsibility |
|---|---|
| Owner or operator | Holds the intent and the record. Decides priorities. Sets operational policy rows: staff rules, retention of presence data, service windows, network governance, remote access, and update windows. Holds every credential and administrative right after handoff. |
| UX for Spaces™ designer | Authors the brief, register, conflict register, alignment documentation, and Technology Construction Package. Coordinates with the design team through Schematic Design and Design Development. Commissions against the register. Where the designer also builds and supports the systems, as Blend does on its own projects, carries build, calibration, and care. |
| Design team | Architect, structural and MEP engineers, lighting designer, interior designer. Each carries its rows on its own drawings under its own professional responsibility. |
| Integration partner | Where implementation is by a qualified partner rather than the designer, builds to the register and the package, not from parts. The method does not change. |
| Trades | Execute the package. Deviations are reviewed before execution so the intended behavior is preserved. |
Support. The UX for Spaces™ process names the final stage Support and Evolve: the way a space is used shifts, expectations change, and the system is kept aligned with real life rather than frozen at the original design. On projects under Blend's care this is delivered through a membership program with scheduled on-site visits, remote support, proactive monitoring where the tier includes it, and programming adjustments within a defined window after any new installation. The register and post-occupancy log are the working documents for every visit. Security updates follow the update plan, and remote access follows the policy the owner chose.
Handover to someone else. A record written in framework rows can be read by another firm. The method requires handover of the register, conflict register, commissioning record, security handoff record, and post-occupancy log in full at the end of any engagement, so that the owner is never dependent on one company to know what their building was designed to do.
A hotel guest arrives at 1 pm off an overnight flight and needs to sleep until evening. Housekeeping is working the floor. The guest in the next key has the television on. The property needs the space back in service by 6 pm for the evening. This example is illustrative and is built from the hospitality rows in the framework.
The study example had one person and one boundary. This one has four classes of user, an operator, a business schedule, and a property that will be verified key by key. The method is the same; the register looks different.
Human requirements. The guest needs dark, quiet, and a stable temperature at a time of day the building would normally treat as midday. Housekeeping needs to know the guest is resting without knocking. Engineering needs to reach HVAC diagnostics without entering. The property needs the space to reset for evening service without a manual walkthrough. The adjacent guest needs to watch television without being told to turn it down.
Criteria. In the guest space while rest is active: light at the pillow under 1 lux M-EDI; background noise at or below the space's NC target, with intermittent intrusion from the corridor and the adjacent key below the level that carries into the space; thermal setpoint held within a 1 degree band with no audible fan speed change. Between keys: partition and door assemblies that reach the isolation target from the adjacent television at normal viewing volume. In the corridor: a status the staff can read without entering.
Coordinated design and behavior.
Trade and drawing responsibility. Partition and door assemblies: architect and acoustic consultant, Construction Documents. Bedside control, corridor indicator, sensors, and masking device: technology drawings at rough-in, trim at MEP finish. Role-based access: programming, with the role definitions supplied by the operator as an operational policy row. HVAC quiet-correction rule: mechanical design at Schematic / DD plus programming. Housekeeping rule for a rest-active key: operational policy, owned by the operator.
Verification, per key. Isolation between keys measured with the adjacent television at a defined level. M-EDI at the pillow in rest state with corridor doors open and closed. NC at the pillow with HVAC in a correction. Functional verification of the arrival state, Rest, corridor indicator, role restrictions (a housekeeping credential attempting to change a rest-active scene is refused), night path, and reset. Recorded per key, because a property is only as good as its worst key.
Tuning. Guest feedback and staff reports map to rows. A recurring report of corridor noise in a particular key routes first to door seal adjustment, then to the masking level for that key, and, if the record shows the isolation target was never met, to a documented limitation for that key with the assembly change it would take.
Operational data. A property running this register can produce a verified performance summary for a key or a floor: air quality, thermal hold, and acoustic measurements over time. That is a report of measured conditions. It is not a certification and not a health claim.
What this does not promise. The guest may still wake. The method removes the causes the building controls: daylight through a gap, a corridor door that slams, a housekeeper's knock, a fan that cycles. It commits the property to conditions per key and gives the operator a record to manage against.
A tag on a row says which external framework the row's behavior relates to. It routes evidence and coordination: on a project pursuing WELL, LEED, or Calm Tech Certified for Spaces, the tagged register shows the consultant where each behavior and its evidence live. As with those standards generally, certification of a project runs through the program's own process with a certified designer on the project.
| Tag | External reference | What the tag means on a row |
|---|---|---|
| CTI-1 to CTI-8 | The Calm Tech Institute's eight principles of calm technology, which build on Mark Weiser and John Seely Brown's work at Xerox PARC in the 1990s. | The row's building behavior demonstrates that principle. Only behaviors carry CTI tags; engineering specifications and measurement requirements do not. |
| WELL codes (L03, S02, A08 and so on) | WELL Building Standard v2, International WELL Building Institute. | The row maps to that WELL feature. Useful on a project pursuing WELL because it tells the consultant where the behavior and its evidence are. |
| LEED codes (EQc2, EAc3 and so on) | LEED v5, U.S. Green Building Council. | The row maps to that LEED credit or prerequisite and routes evidence to the LEED consultant on certified projects. |
| BIO | The method's own tag. | The row has biological or circadian relevance: light, air, thermal, or biometric responsiveness. |
| MOOD | The method's own tag. | The row shapes atmosphere, emotional register, or sensory identity. |
The eight CTI principles as the framework uses them. This is the method's application of the Calm Technology principles to spaces. The eight principles were created by Amber Case, building on research by Mark Weiser and others at Xerox PARC in the 1990s; the Institute publishes them at calmtech.institute/calm-tech-principles, where the Institute defines calm technology as a process for designing technology that works with human attention instead of against it. The principle names below are the method's working phrasing for spaces, and the criteria say when a row earns the tag.
| Tag | Principle | Tagging criterion |
|---|---|---|
| CTI-1 | Requires the smallest possible attention | Autonomous behaviors that execute without occupant input and hold conditions without demanding awareness. |
| CTI-2 | Informs and creates calm | Behaviors designed to reduce anxiety and support psychological safety. |
| CTI-3 | Makes use of the periphery | Information at the edge of attention: ambient indicators, subtle shifts, data on demand rather than pushed. |
| CTI-4 | Amplifies the best of technology and humanity | Signature moments and anticipatory preparation that serve human intent rather than replace it. |
| CTI-5 | Communicates but does not need to speak | Light, masking, and temperature cues that carry meaning without alerts, chimes, or notifications. |
| CTI-6 | Works even when it fails | Local control holds when the network is lost; spaces default to safe states; backup power preserves critical loads. |
| CTI-7 | Uses the minimum technology needed | Single-action controls, one-touch scenes, and systems that add no complexity beyond what the problem requires. |
| CTI-8 | Respects social norms | Privacy modes, role-appropriate access, camera discretion, guest autonomy; occupants do not feel surveilled or overridden. |
Blend and the Calm Tech Institute. Blend is a strategic partner of the Calm Tech Institute and co-presented Calm Tech Certified for Spaces with the Institute's founder at CEDIA Expo 2026. That relationship is why CTI tags are native to the framework. CTI tags roll up to a calm-technology alignment score for the project, and a project designed to the framework arrives at Calm Tech Certified for Spaces with its evidence already organized. As with the other standards, project certification requires a certified designer on the project.
Metrics the framework adopts from external standards. M-EDI and M-DER from CIE S 026:2018. Flicker limits from IEEE 1789-2015. Color rendition by the named specifications of ANSI/IES TM-30-20, Annex E, Table E-2, with CRI 90 kept only as a submittal floor where a manufacturer publishes nothing else. Background noise as NC per ANSI/ASA S12.2-2019. The daytime, evening, and night M-EDI practice targets from the 2022 consensus recommendations published in PLOS Biology (Brown et al.). Each is listed in References.
Color rendition by space intent. TM-30 defines three design intents, Fidelity (F), Preference (P), and Vividness (V), each at three nested priority levels with Level 1 strictest. The framework assigns a named specification to each space intent rather than inventing its own thresholds. Rf,h1 is local fidelity for reds and does the work R9 did in the CRI system; Rcs,h1 is the chroma shift of reds, and a small positive value is what makes skin and food read well. Criteria are evaluated at the space's design illuminance, since TM-30 assumes 200 to 700 lux in a polychromatic environment.
| Space intent | TM-30 specification | Criteria (Table E-2) |
|---|---|---|
| Attention, Focus, Decision making, Learning, Work and production, Restoration | F2 minimum | Rf 90 or higher, Rf,h1 90 or higher |
| Display and exhibition, gallery, archival, video color work | F1 | Rf 95 or higher |
| Gathering, dining, hospitality guest areas, Wellness practice, fitting and consultation | P1, and F2 where the luminaire qualifies for both | Rf 78 or higher, Rg 95 or higher, Rcs,h1 between -1% and +15% |
| Retail merchandise plane | P1; V3 on feature accents only | V3: Rg 100 or higher, Rcs,h1 0% or higher |
| All other occupied spaces | F3 minimum | Rf 85 or higher, Rf,h1 85 or higher |
The three templates below are the minimum record for a space. Copy them as they are. The filled example that follows is the study from the work and focus intention at the start of this document, written as a project record would write it. Names, values, and row numbers in the filled example are illustrative.
Blank: Spatial Performance Brief
Profiles
| # | Profile | Space type | Primary use | Occupant | Performance targets | Experiences | Notes |
|---|---|---|---|---|---|---|---|
| 1 | |||||||
| 2 | |||||||
| 3 |
Spaces
| # | Space name | Floor | Profile | Exceptions (answer that differs, and why) |
|---|---|---|---|---|
| 1 | ||||
| 2 | ||||
| 3 |
Space types are chosen from the Space Type Catalog by ID, or marked Custom. Performance targets are chosen from the 31-term vocabulary, comma-separated. Notes carry the nuance the terms cannot.
Blank: Behavior row
| Field | Entry |
|---|---|
| Row ID (category and number) | |
| Question (if required) | |
| Scene / phase | |
| When / Trigger | |
| Then / Building behavior | |
| Client notes | |
| Space | |
| User | |
| Moment | |
| Priority (1 to 5) | |
| Intervention depth | |
| Impacts Build (stage or enforcement state) | |
| Alignment tags (CTI / WELL / LEED / BIO / MOOD / Pillar) | |
| Experiences and role (Protects / Supports / Enhances) | |
| Scope (project, building, floor, group, profile, space) | |
| Conflict profile (Yes / No) | |
| Verification (position, instrument, target) |
Blank: Conflict row
| # | Space | Category / moment A | Requires | Category / moment B | Requires | Resolution rule | Priority | Intervention depth of the resolution |
|---|---|---|---|---|---|---|---|---|
| 1 |
Filled example: a study designed for focus. Illustrative.
Spatial Performance Brief: profiles
| # | Profile | Space type | Primary use | Occupant | Performance targets | Notes |
|---|---|---|---|---|---|---|
| 1 | Work and Focus 1 | WRK-01 Home Office | Focused work, video calls | One adult, daily use | Focus, Attention, Privacy, Speech intelligibility | Calls most mornings. Doorbell must not interrupt a call. |
| 2 | Gathering and Living 1 | GTH-01 Great Room | Gathering, television | Household and guests | Gathering, Conversation, Hosting | Active in the evenings while the study may still be in use. |
Spatial Performance Brief: spaces
| # | Space name | Floor | Profile | Exceptions |
|---|---|---|---|---|
| 1 | Study | Level 1 | Work and Focus 1 | Shares a wall with the great room. |
| 2 | Great room | Level 1 | Gathering and Living 1 |
Behavior rows
| Field | Row P-01 | Row P-02 | Row P-03 |
|---|---|---|---|
| Row ID | Cognition 1 (project variant) | Gathering 4 and Interface and Control 26 (project variant) | Cognition 9 and Acoustic Design 4 (project variant) |
| Scene / phase | Focus / Entry | Focus / Sustained | Design review |
| When / Trigger | The Focus button is pressed at the study keypad, or a scheduled call begins | A doorbell or entry event occurs while Focus or Video Call is active in the study | Construction documents for the study partition and door are in progress |
| Then / Building behavior | Privacy shades close to the privacy position; glare logic stays active on the exterior shade. Lighting holds 250 lux melanopic EDI or more at the eye and the task illuminance target on the desk, no bare source visible from the chair. Masking rises to its tuned level, at or below 40 dBA at the desk. Temperature holds within its band and corrects silently. CO2 above 800 ppm increases ventilation; 1000 ppm shows an ambient indicator. Notifications hold. A do-not-disturb indicator lights at the study threshold. | No chime sounds in the study. A Tier 1 light pulse runs on the study keypad and the entry fixture. The doorbell sounds in the great room as usual, so whoever is there can answer it. The event is logged and shown when Focus ends. | The partition to the great room, the door, and the head-of-wall are specified to bring great room speech below intelligibility at the desk, and the study's own floor to NC-30 or below. The isolated assembly is drawn on the architectural and MEP sets. No duct, conduit, or plumbing run penetrates it; supply and return are routed through a lined path with a silencer, and the return air path is designed with the isolation, not through it. |
| Client notes | "When I'm on a call I don't want to be looking at the yard or fighting the sun on the screen." | "The doorbell during a call is the thing I hate most." | Architect confirms the assembly; mechanical engineer confirms the routing. |
| Space | Study | Study (indicator also in great room) | Study and great room boundary |
| User | Resident | Resident, guest | All |
| Moment | Work | Work | Anytime |
| Priority | 1 | 1 | 1 |
| Intervention depth | Programming, with shades, masking emitter, sensors, and keypad at infrastructure level | Programming, with the indicator on the entry fixture at trim level | Architectural and structural, with mechanical coordination |
| Impacts Build | Rough-in (devices); Commissioning (logic) | MEP Trim / Finish (fixture); Commissioning (logic) | Schematic / DD (routing); Construction Docs (assembly) |
| Alignment tags | CTI-1, CTI-7; WELL L04, S02, A03, T01; BIO; Pillar: Responsiveness | CTI-3, CTI-5; Pillar: Calmness | CTI-7; WELL S01, S03; BIO; Pillar: Awareness |
| Conflict profile | Yes | No | Yes |
| Verification | M-EDI at the eye and illuminance at the task plane in Focus; NC at the desk with HVAC in a correction; masking level at the desk; CO2 response timed. Functional: shades, indicator, notification hold. | Functional: doorbell during Focus produces the light pulse and no chime in the study; the great room chime sounds. | STI at the desk from speech at conversational level in the great room, with the door closed; NC at the desk. Inspection before drywall that no penetration crosses the isolated assembly. |
Conflict row
| # | Space | Category / moment A | Requires | Category / moment B | Requires | Resolution rule | Priority | Intervention depth of the resolution |
|---|---|---|---|---|---|---|---|---|
| 1 | Study and great room | Cognition / focus and calls | Speech from the great room below intelligibility at the desk; no chime | Gathering / evening event | Open, social, audio throughout | The study isolates regardless of mode; gathering audio does not extend into the study; the doorbell shows as light in the study and sounds in the great room. | 1 | Architectural and structural (assembly and routing), programming (audio zoning and doorbell logic) |
Post-occupancy log entry (illustrative): 2026-11-12. Row P-01. Occupant found the masking audible during quiet reading. Level lowered one step; STI at the desk re-checked with the great room television at normal volume and found within target. Logged by the designer.
Two things are versioned separately: the framework and each project record. Method.
The framework. The UX for Spaces™ Framework carries a version number (currently 16.0, dated 2026-10-15). A version is a specific set of categories, rows, tags, operating principles, specification gates, the construction map, and the Space Type Catalog. A change to any of those produces a new version. Row IDs are stable within a version; a row that is removed keeps its number retired rather than reassigned, so older project records still resolve. Space type IDs follow the same rule.
The project record. Each project's brief, register, conflict register, and commissioning record state the framework version they were built from. A project does not migrate to a newer framework version automatically. When a project is revisited under a newer version, the differences are reviewed row by row and the record states which version governs each row. Post-occupancy log entries reference the row ID and the record version in force at the time.
This document. This document is published with a version and a date. It describes the framework version named in its text. When the framework changes in a way that alters the method described here, the document is revised and the revision is dated. Earlier versions remain available so that citations resolve.
What a version number does not mean. It does not mean an external body reviewed the change. It records that the author changed the method and when.
Provenance. This document was prepared from the v15.4 workbooks and revised against v15.5, v15.6, v15.7, v15.8, v15.9, and v16.0, the UX for Spaces™ process description, the alignment and construction package templates, the experiential sign-off template, and the evidence validation notes. Version 1.1 adds the Intention Declaration and commitment meeting, the field decision process, the Missed Stage enforcement state, continuous monitoring with peer comparison, recommissioning as a recommendation, and a clarification of the word target, and it updates the status of the software. Version 1.2 adds the Network and Security Standard, the redundancy principle, the security rows in Safety and Trust, and the capability definition of Calmness. Version 1.3 retitles the document The Design Standard. Version 1.4 adds space types and profiles. Version 1.5 adds experiences and roles, the scene and keypad model, Autonomous Response, arbitration, scope, detector placement, and the periphery principle. Version 1.6 adds the complete default with paring back, layers and their uses, the quiet air baseline, questions asked once for the project, and the conversation that stays with the life of the space. Version 1.7 revises the performance target vocabulary, states where circadian lighting applies, and sets the keypad limit at four scenes, with ganged keypads serving different categories and a touch interface beyond four scenes in any category. Where a value is cited from a secondary source, the References say so.
Each version of this document is listed with its date and what changed. Earlier versions remain available so that citations resolve.
Describes UX for Spaces™ Framework v16.0. The framework's performance target vocabulary still reads as in version 1.6 and is revised to match in the next framework version.
Performance targets
Circadian lighting
Keypads
Describes UX for Spaces™ Framework v16.0.
The default
Experiences and scenes
Framework v16.0
Describes UX for Spaces™ Framework v15.9.
Experiences and roles
Scenes and keypads
Running behavior
Timing
Principles and wording
Framework v15.9
Describes UX for Spaces™ Framework v15.8.
Space types and profiles
Brief, rows, and records
Framework v15.8
Describes UX for Spaces™ Framework v15.7.
Describes UX for Spaces™ Framework v15.7.
Correction. Versions 1.0 and 1.1 specified privacy behaviors and physical access control but set no requirements for the security of the building systems network those behaviors run on. This version closes that gap.
Security
Pillars
Operating principles
Framework v15.7 (both workbooks)
Describes UX for Spaces™ Framework v15.6.
Coordination and buy-in
Decision timing
Adjustment in actual use
Vocabulary
Software
Framework v15.6 (both workbooks)
First published version. Describes UX for Spaces™ Framework v15.5.
So that the rest of the document can be weighed, here is what the method claims, stated as commitments.
External references cited in this document. Each is a published standard, metric definition, or peer-reviewed study. The method's own documents are listed separately.
Light
Sound
Air
Thermal
Sleep and mechanical transitions (cited through the method's evidence review, Human Performance as a Building Design Requirement)
Interface
Frameworks referenced by alignment tags
UX for Spaces™ documents
UX for Spaces™ is a design standard authored by Jimmy Powers, Principal of Blend Technology. Jimmy is an acoustic consultant, a certified UX designer, and has designed automated technology systems for 25 years. Blend Technology is a Strategic Partner and Recognized Design Partner of the Calm Tech Institute.
UX for Spaces™ is a trademark of Blend Technology. Trademark pending, United States Patent and Trademark Office, application serial number 99789703. Application status at USPTO TSDR.
© 2026 Blend Technology. All rights reserved.